Today the repair guy checked the cap (front of the trailer) for cracks (none), smoothed out the wrinkles in the existing covering, and removed all the caulking
The next stage was to put sealant around the edges and around all of the stuff attached to the roof.
The last stage for the day was to put a different sealant over the whole roof except for the new wood.
Two more days without air conditioning.
Louise and Duane
No comments:
Post a Comment