Saturday, April 11, 2020

Pile Up


On March 28th Duane and I started our newest projects.  His roughed out pile of grandkids' Christmas ornaments is at the 1/2 way point.

My pile of colorful diamond fabric patches for my personal quilt has reached 150  If I put the design only on the top of the bed, I think I'll need a total of 225 patches.  I have a lot more fabric diamonds on the table and think that I'll extend the pattern down the sides also.  For this I'll need a total of 400 patches.  50 more and I'll be 1/2 way also.

Sounds like a lot, but, hey, what else do I have to do?

Plugging along toward the finish,

Louise and Duane

No comments: