On March 28th Duane and I started our newest projects. His roughed out pile of grandkids' Christmas ornaments is at the 1/2 way point.
My pile of colorful diamond fabric patches for my personal quilt has reached 150 If I put the design only on the top of the bed, I think I'll need a total of 225 patches. I have a lot more fabric diamonds on the table and think that I'll extend the pattern down the sides also. For this I'll need a total of 400 patches. 50 more and I'll be 1/2 way also.
Sounds like a lot, but, hey, what else do I have to do?
Plugging along toward the finish,
Louise and Duane
No comments:
Post a Comment